Grey structure
Foundation, RCC frame, brickwork, plaster and concealed pipes and conduits — the complete structural shell.

Per-square-foot rates, material prices, timelines and the costs most quotes leave out — checked against current market data and explained in plain language.
Every rate is per square foot of covered area — the total built floor space across all storeys, not the plot size. Choose a location to see how rates shift across the twin cities.
Foundation, RCC frame, brickwork, plaster and concealed pipes and conduits — the complete structural shell.
A complete, liveable home with quality local tiles, standard fittings, paint and wooden doors.
Porcelain or imported tiles, branded sanitary ware, false ceilings and a modern fitted kitchen.
Marble or granite, designer and smart lighting, custom woodwork and a statement facade.
Priced separately: excavation, retaining walls and waterproofing cost more than floors above ground.
Typical covered area, cost and build time for each plot size. Switch the finish level or the number of storeys to compare.
Covered areas assume typical society bylaws: about 80–90% coverage per floor on smaller plots and less on larger ones. Most societies count 1 marla as 225 sq ft. Prices use the Bahria / Gulberg baseline — pick a location above to adjust.
Amounts follow your calculator selection. The structure is the shell that carries the house; finishing is everything you see and touch.
Budget builds spend roughly 55% on structure and 45% on finishing. Premium builds flip that to about 38% and 62% — the finish level moves your budget more than anything else.
Estimated quantities for the grey structure of your covered area, priced at October 2026 twin-city rates. Change the area to see it update.
| Item | Quantity | Unit price | Estimated cost |
|---|---|---|---|
| Grey structure total |
Planning estimate only — an exact count comes from your structural drawings. Not included: water, shuttering, DPC and termite treatment, pipes and conduits.
All prices in PKR, typical twin-city ranges. Prices move weekly — confirm on the day you buy. A-class (awwal) bricks ring clearly when knocked together and measure 9 × 4.5 × 3 inches. Use Grade 60 steel for columns and slabs.
Typical durations from ground-breaking to handover for a double-storey turnkey home. Select a plot size.
Architectural and structural drawings, the 3D elevation and approval of the map (naqsha) by the society or authority.
Get a soil test before the design is final — on weak ground, foundation costs can double.
Monsoon (July–August) and peak winter (January) slow slab pours and outdoor work. Stop-start funding adds 4–8 weeks every time a site restarts, and each major design change can add 30–60 days.
Drag the slider to see the same house as a grey structure and as a finished home.
Scopes vary between builders, so always compare quotes on identical written scope. Your Tiwas contract spells out exactly what is included.
Construction is only part of the bill — hidden costs typically add 10–20%. Tick what applies to you to see an all-in figure.
Four things to sort out before the first excavator arrives — they decide your design, your foundation and how smoothly the build runs.
CDA, RDA, DHA and Bahria Town all require approved drawings before construction starts. Budget about PKR 1–3 lakh for approval fees.
Regulated societies inspect at key stages and can stop work that doesn’t match the approved drawings. Building exactly to the drawings protects your investment.
A soil test costs PKR 25,000–50,000 and decides between strip footings and a raft or pile foundation — it can prevent lakhs in surprise foundation work.
Plan gas (SNGPL), electricity (IESCO) and water connections early, and budget PKR 1.5–2.5 lakh for them.
Most budget overruns come from the same handful of mistakes. Hover or tap a card.
Grey structure costs about PKR 3,000–3,600 per sq ft of covered area. A complete turnkey house costs about PKR 5,500–7,000 per sq ft at standard finish, 7,000–9,500 at premium and 10,000–14,000 for luxury. A 10 marla double-storey home of about 3,600 sq ft comes to roughly PKR 2–2.5 crore at standard finish.
A double-storey 5 marla house has about 2,050 sq ft of covered area. The grey structure costs about PKR 62–74 lakh, and a standard turnkey house about PKR 1.1–1.45 crore. Premium finishes, a basement or an Islamabad sector location push it higher.
Because you pay for what is built. Covered area is the total floor space across all storeys — a double-storey 10 marla house has about 3,600 sq ft of covered area on a 2,250 sq ft plot. Always compare quotes on covered area.
The complete structural shell: foundations, RCC columns, beams and slabs, brick walls, plaster, roof treatment and concealed pipes and conduits. It has no tiles, paint, doors, fittings or wiring — those come with finishing.
For a double-storey turnkey home: about 8–11 months for 5 marla, 10–14 months for 10 marla and 12–18 months for 1 kanal. A grey structure alone takes about 3–8 months depending on size.
Usually, yes. Islamabad sectors and regulated societies cost more because of stricter bylaws, stage inspections, transport and rocky sub-soil in many areas. Open plots in Rawalpindi are typically around 10–20% cheaper.
A basement is priced separately — about PKR 4,000–4,800 per sq ft for the grey works, because excavation, retaining walls and waterproofing are involved. Finishing it costs extra, at the same level as the rest of the house.
The plot itself, map approval and society fees, soil test and design fees (unless agreed), gas, electricity and water connections, the boundary wall and gate, landscaping, furniture and solar or backup power. Together these usually add 10–20%.
Yes. Once the design and specification are agreed, we fix the price in a written contract, and you pay in milestones as each stage is completed.
Yes — your first consultation and cost estimate are free. Share your plot size and location on WhatsApp or through the form and we’ll arrange it.
Tiwas Builders is PEC registered and a registered company, and is ISO 9001, ISO 14001 and OHSAS qualified. We have more than 10 years of experience and 87 completed projects.
It’s a planning tool built on October 2026 market rates and is typically within ±10–15% for standard homes. A firm price needs drawings and a specification — that’s what we prepare in your free consultation.
How we built this guide: rates and prices are compiled from published 2026 market rate guides and material price lists for Islamabad, Rawalpindi and other major cities, cross-checked in October 2026. They are planning figures, not a quotation.
Tell us about your plot or project. We’ll get back to you with ideas and a free cost estimate.